On the Job with C: Lake home install

We have moved in furniture to the main and upper floors to allow our clients to start enjoying their second home.  While the builder is working the lower level, porches and landscaping we are still working the little details of installation and accessorizing.  Each day there is something new to enjoy and unveil.  Here are some non-professional/in process photos of the work at hand….

1} Dining Room – While the shades are being protected with wrap and much “stuff” is on the tables, we love the reflection the chandelier gives in the iron mirror {2} The kitchen and breakfast sitting area contain the client’s wish list lazy boy recliners {3} The mud room is ready and waiting for all 5 kiddos and the dog.  {4} Master Bedroom…

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s